Q69 Series Roller Conveyor Shot Blasting Machine
The Q69 series roller conveyor type shot blasting machine is specifically designed to clean the external surfaces of steel pipes, round bars, drilling rods, and steel plates. It efficiently removes rust, oxide layers, and paint films while intensifying the surface for better coating adhesion.
★
Primary Applications:
- Removing scale and rust from metal profiles and sheet metal components.
- Surface treatment of H-beams, steel plates, profiles, angle steel, and pipes.
- Sandblasting cleaning of complex welded structures, ensuring all welds and ribs are thoroughly descaled.
- Industries: Shipbuilding, Automotive, Infrastructure (Bridges), and Heavy Machinery.
Core Components & Features
1. Shot Blast Cabinet & Roller System
Roller Conveyor Details:
- Load Capacity: 2 tons/meter
- Roller Speed: 0.5–4 meters/minute (Variable)
- Protection: Special alloy sleeves with a service life > 4,000 hours
- Drive: Variable-speed reducer system
2. Blast Chamber & Control System
Chamber Construction:
- Lining: SPMn13 and 65Mn protective lining for high wear resistance.
- Curtains: Four layers of heavy-duty rubber curtains.
- Control: Siemens or Omron PLC units with manual/automatic modes.
- Safety: Emergency stop buttons on main panel and conveyor.
3. Abrasive Removal & Dust Collection
Equipped with a rotating brush and high-pressure blow-off station, the system ensures workpieces are free of media after processing. The dust removal system uses cartridge collectors, reducing emission standards to 80 grams per cubic meter with an airflow of 26,000 m³/h.
Packaging & Logistics
Standard Procedure:
• Packaging: 40'HQ container for safe transport.
• Lead Time: Approximately 30-50 days depending on customization.
• Documentation: Full English manuals, foundation drawings, and electrical diagrams provided.
Frequently Asked Questions
How long is the production lead time?
Standard machines are often in stock. For customized designs tailored to specific requirements, the process from engineering to completion typically takes 30 to 50 days.
What is the quality guarantee period?
We provide a one-year quality guarantee. We utilize world-famous component brands like Siemens and Omron to ensure long-term stability and performance.
Do you provide overseas installation and training?
Yes, we provide overseas services where technicians are sent to assist with installation, commissioning, and staff training. The duration varies from 5 days for small units to 30+ days for large systems.
How is quality control managed during manufacturing?
Quality control is prioritized at every stage. Each machine is fully assembled and undergoes rigorous testing before it is approved for shipment.
Can the machine dimensions be customized?
Absolutely. We specialize in designing and manufacturing non-standard steel pretreatment equipment based on the specific steel dimensions and production flow you provide.
What technical documentation is provided?
We supply a complete set of English documents, including foundation drawings, operation manuals, electrical wiring diagrams, and maintenance schedules.